日本不无在线一区二区三区视频_在线着AV的网址_国产高清无码福利_中文字幕无码视频一区二区三区_久久久久9久99

NewsHome > News > Industry dynamics

How many meters can a concrete paver spread a day?
release time:2019-11-14 15:38:00      hit count:2334

圖片2(1).jpg

How many meters can a concrete paver spread a day? The specific number of meters that can be paved is not fixed. It depends on the specific project, the difficulty of the project, and the on-site feeding, the cooperation of the workers, and many factors. And there are weather conditions. Specific engineering specific analysis.

1. Is the personnel scheduling reasonable?

2. Whether the various machines are working properly.

3. Paving the width and thickness of the pavement

4. Paver operator proficiency

5. Model configuration of paver

6. Weather

7. Construction environment (such as the distance of the material yard, the size of the transport vehicle, etc.), etc.

Therefore, how many meters can be spread in a day, there is no way to calculate, generally slow progress can also spread about 500 meters, the speed is fast, 2-3 kilometers a day also.

Welcome information Xuzhou New Road Intelligent Technology Co., Ltd.

Xuzhou Xinlu Intelligent Technology Co., Ltd. was established on January 31, 2019. It is a modern intelligent technology company jointly established by Xuzhou Xinluyuan Machinery Technology Co., Ltd. and Jiangsu Jiji Road Engineering Technology and Equipment Research Institute Co., Ltd.

The company is mainly engaged in multi-functional cement concrete slipform paver, curb stone slipform paver, roadside stone forming machine, water strip sliding mold machine, shoulder molding machine, New Jersey anti-collision guardrail forming machine and other cement concrete pavement maintenance equipment. R & D, manufacturing and sales; provide a variety of cement concrete anti-collision guardrails, gutters, shoulders, curbs / roadside stone and other structural sliding form construction plans; research and extension of the foundation and new materials in cement concrete sliding form Application in paving construction.

圖片3(1).jpg


Previous: How many meters can the curb stone slide be made a day? How is the construction efficiency?
Next: The role of concrete additives in improving concrete sliding form construction

Back to list

News you are interested in
开化县| 卢湾区| 沁阳市| 东台市| 南京市| 盐城市| 加查县| 明溪县| 惠州市| 大厂| 莫力| 嘉善县| 平顶山市| 汉沽区| 金塔县| 河东区| 茌平县| 垦利县| 介休市| 伊金霍洛旗| 石城县| 邯郸市| 太和县| 平南县| 大竹县| 阿拉善盟| 丹寨县| 正蓝旗| 新沂市| 肥西县| 鹤壁市| 德格县| 丰都县| 景泰县| 金湖县| 潼关县| 南安市| 公主岭市| 图片| 布尔津县| 阳城县|