日本不无在线一区二区三区视频_在线着AV的网址_国产高清无码福利_中文字幕无码视频一区二区三区_久久久久9久99

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2011

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
开封市| 鄱阳县| 奇台县| 古蔺县| 鞍山市| 自贡市| 龙门县| 廉江市| 当阳市| 松溪县| 乐东| 黔西| 苏尼特右旗| 台东市| 什邡市| 徐汇区| 锦屏县| 敦煌市| 南涧| 连山| 长葛市| 米脂县| 新竹县| 贞丰县| 卢氏县| 两当县| 常熟市| 疏勒县| 津市市| 扎兰屯市| 河池市| 墨玉县| 桂阳县| 澳门| 双流县| 隆德县| 抚远县| 特克斯县| 浪卡子县| 胶南市| 河北区|